Article
Locksmith Quote Negotiation Scripts
Updated October 11, 2026
Negotiate lines, not totals
A lump-sum quote hides the padding. Ask for parts, labor, and trip fee as separate lines — then negotiate each against its range with the quote checker open.
Scripts that work
Parts above range
“Which exact models are on this quote? I see this deadbolt at [retail] — can you match it, or should I supply the hardware and book labor-only?”
Labor above range
“What triggers the high end here — is it per-lock or flat? Can we fix per-lock pricing, and is haul-away plus the function test included?”
Trip fee stacked on high labor
“Your labor is already top of range — can the trip fee be credited against the work if I accept today?”
Walk-away lines
No firm price before arrival, cash-only, drilling first. Two comparable quotes beat one clever negotiation — model the DIY fallback with the cost estimator and DIY guide first.